Permadeck SystemsProduct Finishing

Millom & Wigton Station – Renovation Works

Wigton & Millom Footbridge

At over 150 years old, both Wigton and Millom footbridges have been suffering from corrosion and coating failure for several years. Working with Taziker Industrial, we have provided extensive renovation works, including: removal of the existing paint, a new protective paint system and new underfoot safety.

Asset Owner:

Principal Contractor:

Designer:

Supply Chain Partner:

Network Rail

Taziker Industrial

Network Rail

NL Williams Group

Removing the existing coating & surface preparation

Before the renovation works could begin, the existing paint was removed using abrasive shot blasting to expose any potential repairs and heavily corroded areas. Surface preparation is arguably the most important part of protective coating system, having a clean, contaminant free substrate is vital to the system’s life expectancy, more so with older structures.

Following inspection and repair by Taziker Industrial, they returned both structures to our St Helens facility for painting and GRP installation.

Sealing of lattice parapets

It’s important to cover all aspects of potential corrosion and coating failure when applying a protective coating system. With lattice parapet design, it is highly likely to suffer from “rust bleeding” which is when rust drips down from small gaps between connected surfaces. Not only is this unsightly, but it can also result in coating breakdown if left untreated. To combat this, we applied a mastic sealant to all connected joints on the lattice parapets further improving the coating system’s performance.

Protective Paint System

Following our initial blast clean and repairs by Taziker Industrial, our Product Finishing team applied a Network Rail approved, 3 coat paint system utilising glass flake epoxy – protecting both structures for 15 years. You can read more about our protective coating and surface preparation services here.

What our client had to say

"NL Williams, one of our valued supply chain partners, have a vast wealth of experience in their field. Great communication from their delivery team, along with the ability to meet tight deadlines, supported the smooth delivery of this project.”
Carl Webster
Engineering Manager - Taziker Industrial

Underfoot safety

Millom

Suffering from the same fate as the rest of the footbridge, the existing timber decking had to be removed and replaced with a suitable alternative. We opted to use our GRiP Plank 500 decking system, combined with Permagrip PU anti-slip surfacing, DDA Stairmaster nosings and GRP riser plates to replace the main span decking, treads and landings.

Corduroy tactile flooring panels have been fitted to the main span for additional DDA compliance and our Permadeck Systems site team carried out the same works to the staircases left in situ at Millom Station, fitting out both staircases with the same decking system.

With this method, we can create a lightweight, durable and load-bearing alternative to steel with little to no maintenance.

  • GRiP Plank 500 – Interlocking GRP Decking Solution.
  • DDA Stairmaster Nosings (Type II) – Durable aluminium and GRP stair nosing.
  • Permagrip PU – Polyurethane based resin combined with a high friction aggregate.
  • Permagrip Corduroy Tactiles -Hazard warning (off street) tactile flooring.

You can find out more information on the above products here.

Wigton

The existing timber decking on the Wigton footbridge was removed and replaced with steel plates. Our PDS team then applied Permagrip PU anti-slip surfacing , installed DDA Stairmaster Nosings & fitted corduroy tactile flooring to the span deck and stairs.

Following successful site installation by Taziker Industrial, our site team visited Wigton Station to carry out the same works to the staircases on site.

  • DDA Stairmaster Nosings (Type II) – Durable aluminium and GRP stair nosing.
  • Permagrip PU – Polyurethane based resin combined with a high friction aggregate.
  • Permagrip Corduroy Tactiles -Hazard warning (off street) tactile flooring.

You can find out more information on the above products here.